31141 Wheel Ave #401, Abbotsford, BC V2T 6H2

  +1 (778) 552-7663  Sales@directmetal.ca

HomeRe-Roofing Services

Re-Roofing Services

Complete Roof Replacement

Re-Roofing Done Right.

A better roof starts with more than new shingles.

Direct Roofing provides complete re-roofing and roof replacement for homes, strata and multi-unit properties, and commercial buildings throughout the Fraser Valley and Lower Mainland. We inspect the existing roof, remove failed materials when required, address the roof deck and ventilation, install the correct underlayment and flashings, and build the new system for long-term performance in BC weather.

★★★★★ 4.9 · 220+ Google reviews · BBB Accredited

Get Your Roof Repair Estimate

Tell us what you are seeing. For urgent leaks, call us directly for the fastest response.
More Than A New Roof Covering

WHAT RE-ROOFING SHOULD ACTUALLY INCLUDE

Re-roofing is the process of renewing an existing roof system when age, wear, leakage, storm damage or repeated repairs make replacement the better long-term decision. The visible roofing material is only one part of the project.

A professional re-roofing project considers the existing deck, underlayment, ventilation, flashings, valleys, penetrations, drainage and transitions before the new roofing system is installed. This is where workmanship matters most.

Existing roof assessment

Tear-off & disposal

Roof deck inspection

Deck repairs as required

Underlayment & waterproofing

Flashing replacement

Ventilation review

New roofing installation

The Details That Protect The Investment

A RE-ROOFING PROJECT IS MORE THAN THE FIELD OF THE ROOF

Many leaks develop at transitions and penetrations rather than in the middle of the roofing material. These supporting details deserve the same attention as the new roof covering.

Ventilation

Attic and roof ventilation should be considered during replacement because heat and moisture management can affect long-term performance.

Flashings

Walls, chimneys, skylights, plumbing penetrations, valleys and roof transitions depend on properly integrated flashing details.

Roof Deck

A full tear-off creates the opportunity to see areas that were previously hidden beneath the roofing system and address repairs where needed.

Drainage

Gutters, drains, scuppers and roof drainage should move water away from the building effectively after the new roof is complete.

Complete re-roofing services

One contractor.
Every roof detail.

A complete project includes far more than installing the visible roof covering.

01

Roof Condition Assessment
Review of existing materials, flashings, drainage, visible deck concerns and access conditions before defining the scope.

02

Full Roof Tear-Off
Controlled removal of existing materials with staging, debris handling and protection for landscaping and building access.

03

Approved Roof Re-Cover

Overlay assessment and installation where the existing assembly, manufacturer requirements and applicable conditions permit it.

04

Deck Repairs
Replacement of accessible deteriorated sheathing or damaged substrate identified after removal, within the approved scope.

05

Flashing Renewal
New valley, wall, chimney, skylight, plumbing and transition details integrated with the selected roof system.

06

Ventilation Improvements
Review of intake and exhaust strategy so roof renewal considers attic heat and moisture management.

07

Skylight Coordination
Replacement or re-flashing planning where skylights intersect the roof and should be addressed during re-roofing.

08

Gutters, Fascia & Soffit
Roof-edge coordination where drainage or exterior components should be repaired or renewed with the roof.

09

Strata Re-Roofing
Phasing, resident communication, access planning and documented scope for townhome and multi-unit communities.
Quality & warranty planning

Protect the investment after installation.

A warranty is only one part of a successful roof. Product eligibility, installation details, ventilation, maintenance and clear documentation all matter.

Written Scope

Know what is removed, installed, included and handled as an allowance.

Compatible System

Components are selected to work together rather than as isolated products.

Installation Details

Flashings, penetrations, edges and transitions receive project-specific attention.

Workmanship Coverage

Confirm the contractor’s written workmanship terms before construction.

Manufacturer Coverage

Product warranties vary by system, product line and registration requirements.

Maintenance Plan

Periodic inspection and drainage care help protect the renewed roof.
Re-roofing investment

What affects
the price?

A reliable estimate reflects the entire scope, not only the visible square footage of the roof covering.

Roof size & geometry

Area, slope, hips, valleys, dormers and transitions.

Tear-off requirements

Number, type and condition of existing layers.

Material selection

Shingle profile, metal system, cedar grade or membrane.

Deck repairs

Extent of sheathing work discovered or anticipated.

Flashing complexity

Walls, chimneys, skylights and penetrations.

Access & protection

Height, staging, landscaping and occupied areas.

Ventilation changes

Intake, exhaust and roof-opening coordination.

Gutters & roof edges

Drainage or fascia work included in the project.

Re-roofing FAQs

Clear answers before you replace.

Use these answers as a starting point; the right scope still depends on an on-site roof assessment.
People often use the terms interchangeably. More specifically, re-roofing may refer to either renewing the roof generally or adding a new covering over an existing roof. A full replacement normally means removing the old materials and installing a new system from the prepared deck.
Sometimes, but only when the existing roof, number of layers, deck, moisture conditions, slope, flashings and applicable requirements make an overlay suitable. A lower initial cost does not automatically make it the best long-term option.
Removal exposes accessible decking, eliminates deteriorated layers and allows new underlayment and flashings to integrate cleanly. It also avoids carrying hidden defects into the renewed roof.
Consider roof age, the number and location of leaks, widespread material condition, flashing deterioration, prior repairs and expected ownership horizon. A localized defect on a serviceable roof may justify repair; systemic deterioration may favour renewal.
Timing varies with roof size, geometry, material, tear-off volume, deck repairs, access and weather. The project schedule should be discussed after the roof is measured and the final scope is selected.
Deteriorated or unsuitable areas should be documented and addressed before covering them. A clear proposal should explain any included allowance or unit pricing for unforeseen deck repairs.
It can be a practical time to replace older skylights because their flashings integrate directly with the new roof. Age, condition, glazing performance and compatibility with the selected roof system should be reviewed.
Yes, where the roof layout, budget and risk profile support phasing. A phased plan should account for temporary transitions, resident access, consistent materials and priorities across buildings.
There is no single best material. Architectural shingles, metal, cedar and 2-ply SBS each suit different slopes, budgets, appearance goals and maintenance expectations. The right choice begins with the roof design and project priorities.
Look for removal and disposal, substrate preparation, deck-repair allowances, underlayment, flashings, ventilation, roof covering, accessories, edge and drainage details, property protection, cleanup, warranties and exclusions.
  • Residential
  • Commercial
  • Contact